Pigmented acrylic primer for exterior walls and Clima Total system

White acrylic primer, ready prepared recommended as support layer for KRAFT Decorative Plasters. When applied it forms a slightly textured coating (rough) to provide a good adhesion of the plaster. It is suitable for interior and exterior surfaces such as lime and cement plasters, concrete, lime/gypsum boards, mineral, silicate and surfaces previously painted with acrylic paints. Recommended and ETA certified to enhance the adhesion of Acrylic Plaster, Clima Comfort Stucco, Flexo Plaster, Waterproof Plaster and Granite over exterior thermal-insulating systems (ETICS) and in particular the ClimaTotal® System.

» Ease of application
» Excellent spread rate
» Excellent adhesion
» High coverage power

Araiosi_01

Thinning
0%

Araiosi_01

Coverage
8-10m2/L

Araiosi_01

Tools
Brush, paint roller

Araiosi_01

Dry to touch
4 hours

Packaging

1 L, 10 L

Shades

Transparent, White



  • Instructions
  • STORAGE

Instructions

SURFACE PREPARATION AND APPLICATION
» To ensure proper adhesion and adequate substrate penetration, the surface must be dry, clean and free of dust, oil, salt, rust, loose paint and residues, blistered paint etc. Remove all moss, fungi and algae by mechanical abrasion and wash with soapy water and allow the substrate to dry.
» Use KRAFT PUTTY or other suitable repairing material of KRAFT to fill gaps, cracks and other damaged surfaces.
» It is recommended that fresh concrete, stucco, plaster and gypsum surfaces are allowed to dry for at least 4 weeks
before the application of PLASTER PRIMER.
» CLIMATotal®: Apply PLASTER PRIMER after STRONG BOND.
Let it dry for 4-8 hours before apply the final decorative plaster.
» Suitable on: Reinforcement layers of thermal insulating composite system, lime and cement plasters, concrete, lime/gypsum plasters, mineral, silicate and water-base coats and plasters with good adherence properties, sandwich type plaster boards.
» Not suitable on: fresh lime finishes, plastics, varnish and oil film, distemper. May use BONDING PRIMER.

APPLICATION INSTRUCTIONS
» Tools: Brush or roller.
» Thinning: The tools and spillages may be cleaned immediately with soapy water.
» Cleaning: The tools and spillages may be cleaned immediately with soapy water.
» Surface drying time: 4 hours, conditions temperature 25ºC and 50% relative humidity.
» Minimum time required for appliance of final plaster: 4 hours.
» Drying time: 24 hours, conditions temperature 25ºC and 50% relative humidity.
» The air, material and base temperature during processing and binding must exceed 5ºC. Protect facades against direct solar irradiation, rain or strong wind (for instance with scaffolding netting). High relative humidity and low temperatures can prolong the drying time considerably and cause the color to vary.

STORAGE

» Store containers at 5ºC to 35ºC.
» Keep containers tightly closed when not in use.

NEWSLETTER

Μάθετε πρώτοι όλα τα νέα.